Identity area
Type of entity
Authorized form of name
Parallel form(s) of name
Standardized form(s) of name according to other rules
Other form(s) of name
Identifiers for corporate bodies
Description area
Dates of existence
History
On March 24, 2003 Fisheries and Oceans Canada received a proposal from Bilcon of Nova Scotia for the construction of a 152-hectare basalt quarry, processing facility and marine shipping terminal at White’s Point, approximately 35 km southwest of Digby, Nova Scotia, along the shores of the Bay of Fundy.
A joint federal-provincial review panel for the Whites Point Quarry and Marine Terminal Project was announced on November 5, 2004. The three-member panel consisted of Dr. Bob Fournier, Dr. Jill Grant, and Dr. Gunter Muecke. On March 31, 2005 the panel released final guidelines for the preparation of the Environmental Impact Statement (EIS), which would provide direction to Bilcon in preparing a statement of the project's anticipated environmental impact.
The joint panel review provided the report to the Ministers on October 22, 2007. The Ministers released the report on October 23, 2007.
After consideration of the report, the Minister of Environment and Labour announced on November 20, 2007 that the project posed unacceptable risk to the environment and to the community. The application to establish Whites Point Quarry and Marine Terminal was not approved.
Places
Legal status
Functions, occupations and activities
Mandates/sources of authority
Internal structures/genealogy
General context
Relationships area
Access points area
Subject access points
Place access points
Occupations
Control area
Authority record identifier
Institution identifier
Rules and/or conventions used
Status
Level of detail
Dates of creation, revision and deletion
Language(s)
- English